Loading Please Wait
Loading please wait

Loading Please Wait
Loading please wait

The past. Our present. Your future.

TOBuilt SEARCH:   BACK TO RESULTS   FULL RECORD   NEW SEARCH

The Holy Trinity Catholic School

LAST UPDATE: June 16 2023 login to edit this building
BUILDING INFORMATION
Name & Location:
The Holy Trinity Catholic School
6 Colonel Samuel Smith Park Drive
Toronto
New Toronto
Owner:
Toronto Catholic District School Board
Occupant:
Toronto Catholic District School Board
Year Completed:
2017
OTHER IDENTIFICATION
Notes:

The all-new Holy Trinity Catholic School, which was designed by Moriyama & Teshima Architects in 2017, is designed for 536 students from junior kindergarten through eighth grade. Located between Lake Ontario and Lakeshore Boulevard, and within the historic grounds of Colonel Samuel Smith Park, the school is bordered by a scenic hundred-yearold heritage apple orchard as well as Humber College’s new academic facilities.

With a presence on Colonel Samuel Smith Park Drive, the three-storey school stretches out from East to West. Taking full advantage of the sunlight from the south, the school offers expansive views of the heritage orchard below from large classrooms windows installed on all three storeys. Taking advantage of the orchard, Holy Trinity’s kindergarten program occupies the southern edge of the ground floor with access to a dedicated kindergarten playground slotted between the orchard and the building.

Informed by a Future-Proof design approach, durable construction methods were combined with efficient and flexible planning in order to meet the functional, aesthetic and sustainable needs of Holy Trinity school and the Ministry of Education. Load-bearing masonry and hollow core slabs are paired with subtly-coloured, glazed brick cladding to create a clean, elegant composition and indicate the school’s main entrances and play areas. Radiant heat, displacement ventilation, and LED lighting help keep the operating costs down and when combined with the strategic use of glazing, allowing the school to comply with the prescriptive method of achieving SB10 energy efficient code requirements.

The new school is 55,400 SF and cost $12,043,000.

Status:
Completed
Map:
Loading Map
Companies:
The following companies are associated with this building
BUILDING DATA
Building Type:
School
Current Use:
Educational
Heritage Status:
Listed
Main Style:
Sources:
TOBuilt SEARCH:   BACK TO RESULTS   FULL RECORD   NEW SEARCH
© 2024 ACO Toronto
Top